Heat welded walkway.
Flue thru roof detail.
Rainwater outlets are also classed as penetrations as they go down vertically through the deck and or horizontally through the parapet.
Plumbing questions answers tips and tricks.
The lower edge is hemmed for stiffness.
Care should be taken to follow manufacturers installation and safety clearance instructions.
Typical single storey flue system through framed chimney with cap flashing flat ceiling with open roof cavity space and pitched roof.
If the vent pipe isn t installed properly the roof may leak through or around the pipe penetration leading to costly repairs.
The penetration will be oval to have a round pipe exit.
The base flashing extends onto the roof a minimum of 4 and is soldered to the ventilator.
This detail illustrates a method of flashing a ventilator on a sloped roof.
Wall flashing with coated metal edge.
This is a graphical display of a typical freestanding 150mm diameter flue system.
Roof area divider curb type.
Step 1 go into your attic.
The flashing is then nailed to the roof.
See table 2 a roof flash ing is placed down over the pipe and adjusted so it fits tightly against the roof with the pipe section held in a position maintaining the 1 inch minimum clearance from combustibles.
Common penetration details include soil vent pipes hot pipes from boiler flues or log burners electrical cables for air conditioning units extraction ducting and tracks for mechanical window cleaning systems.
Reply to vertical flue through a polycarb roof.
Plumbing questions answers tips and tricks.
Detail for attachment to metal panel siding or fascia.
X 5 8 bolt brass alum.
Roof flashing details index fd01 interior roof drain detail fd02 interior drain with gravel stop detail fd03 scupper roof drain detail.
Downspout strap detail 1 4 dia.
The roofing material shingles asphalt paper etc should overlap the top edge up.
Large flashings are formed with a hook edge on the top and sides and cleated to the sheathing at 12 o c.
This detail for cmu installation only.
Paraguard expansion joint roof to wall with parasolo flashing.
Wall with self terminating parapro paraflex 531 liquid flashing.
Attach wood nailer to wall or deck with suitable.
With the pipe in a vertical position trace around the pipe using a pencil.
Gutter brackets are required to be at least one gauge heavier than gutter stock.
Fd17 and interior drains or through curb scuppers to drain the roof.
Position the vent pipe up to the bottom of the roof.